My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#5647-variances-2007
Orono
>
Property Files
>
Street Address
>
R
>
Rest Point Circle
>
1350 Rest Point Circle - 07-117-23-31-0024
>
Resolutions
>
#5647-variances-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:34:21 PM
Creation date
7/18/2018 10:28:57 AM
Metadata
Fields
Template:
x Address Old
House Number
1350
Street Name
Rest Point
Street Type
Circle
Address
1350 Rest Point Cir
Document Type
Resolutions
PIN
0711723310024
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
°moo <br />CITE' of OR000 <br />RESOLUTION OF THE CITY COUNML <br />NO. 5647 <br />CONCLUSIONS, ORDER AND CONDITIONS <br />Based upon the above findings, the Orono City Council hereby grants variances to Orono <br />Municipal Zoning Code Sections 78-330 and 78-1288 to allow construction of a new <br />residence, subject to the following conditions: <br />1. Council approval is based on the site and house plans submitted by the <br />Applicant and annotated by City staff, attached to this Resolution as Exhibits <br />A. and B. Any amendments to these plans may require further Planning <br />Commission and City Council review. <br />2. Hardcover in the 0-75' zone (other than the permitted lift) shall be limited to <br />195 s.f. or 3.88 %. Hardcover in the 75-250' zone shall be limited to 2,588 s.f. <br />or 28.33% per the proposed site plan and hardcover allowance summary as <br />depicted on Exhibit C. The owner is advised that any future requests to <br />increase hardcover or change the nature of existing/approved hardcover shall <br />require City approval, and increases in hardcover will not likely be approved <br />without concurrent reduction in existing hardcover. <br />3. The Certificate of Occupancy shall not be issued until an as -built grading plan <br />verifying compliance with engineering and zoning approvals has been <br />submitted and approved. Any deviation from the approved plan may require <br />Planning Commission and/or City Council review. <br />4. By a separate document the Owner shall provide a drainage easement along the <br />easterly five feet of the lot. <br />5. The Owner shall remove the decks, and sheds within the 0 to 75 foot zone. <br />Owner shall repair or replace the existing stairs to the lake to comply with <br />Orono City Code and the Building Code or install a lift to provide lake access. <br />6. The retaining walls on the 0 to 75 foot zone shall remain and fill shall be <br />placed behind the walls as necessary to provide proper drainage. Invasive plant <br />species on the bluff/steep slope shall be removed. Appropriate native plant <br />material shall be planted on the slope where necessary for erosion control. The <br />plan for this work shall be approved by the City Engineer and it shall be <br />completed before the Certificate of Occupancy is issued. <br />Page 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.