My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-P06604 -demo
Orono
>
Property Files
>
Street Address
>
R
>
Rest Point Circle
>
1348 Rest Point Circle - 07-117-23-31-0023
>
Permits/Inspections
>
2003-P06604 -demo
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:34:16 PM
Creation date
7/18/2018 9:59:57 AM
Metadata
Fields
Template:
x Address Old
House Number
1348
Street Name
Rest Point
Street Type
Circle
Address
1348 Rest Point Cir
Document Type
Permits/Inspections
PIN
0711723310023
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
riITY OF ORONO APPLICATION FOR DEMOLITION PERMIT <br /> LL P.O. Box 66 (2750 Kelley Parkwayj <br /> Crystal Bay, MN 55323 <br /> SPECIAL CONDITIONS & HOLD HARMLESS AGREEMENT <br /> General Instructions <br /> 1. You may be required to obtain other permits, i.e. well abandonmment, etc. <br /> 2. Work must not begin unless the permit card is available on the job site. <br /> 3. A 24 hour notice is required for all inspections. Call(612)249-4600. <br /> . � <br /> JOB SITE ADDRESS: 3 e S� 1 YL � u�� <br /> Occupancy Type: �Residential Commercial <br /> OWNER'S NAME: �� � � S L�C Phone. � 3 �� �{� � <br /> Mailing Address: �SDD I�.(� P�-SD v� �a�P_S City: YK.��e � �; v��, t1/l� <br /> � �- S�3S� <br /> CONTRACTOR'S NAME:�� l i ni S Bus.No���a-��3g—4 l 33 <br /> Mailing Address: �t �{(�, ��.� � City: �,o��', � S <br /> Demolition if planned by means of: manual disassembly <br /> �heavy equipment <br /> Permits Issued: <br /> # Well Abandonment <br /> In return for issuance of said Demolition Permit,the undersigned owner hereby agrees as follows: <br /> 1. The structure(s) shall be kept enclosed andlor secured until such time as demolition is <br /> complete. � <br /> 2. Demolition debris will be kept off adjoining property and/or the public rights-of-way unless <br /> specific prior approval is obtained in writing for temporary use thereof. <br /> 3. Foundations shall be completely removed from the ground. <br /> 4. All demolition debris shall be completely disposed of off site in accordance with all <br /> applicable PCA requirements. <br /> 5. Water wells must be abandoned in accordance with State Health Department regulations. <br /> 6. Inspection required when all debris has been removed, before backfilling. <br />
The URL can be used to link to this page
Your browser does not support the video tag.