Laserfiche WebLink
.P <br /> ' �Pa�,2�� <br /> CITY OF ORONO S�PTIC SYSTEM PERMIT APPLICATION <br /> Box 66 (2750 Kelley Parkway) <br /> Crystal Bay, MN 55323 <br /> ___ , �� . <br /> JOB SITE ADDRESS: � � G� i � � <br /> Occupancy Type: Residential � Commercial Other <br /> Permit Type: New or Re I�acement System, $100.00 1/�r <br /> Repair E sting System, $ 50.00 <br /> (Tanks or Drainfield) <br /> 0.50 State surcharge added to above fees <br /> *See fee schedule for non-residential permit fees <br /> Owner's Name:S�-<-�� (J�'c.l�-��.,,�� PhoneNumber: <br /> Mailing Address: City: 7ap: <br /> Contractor's Name: �-}c�4��� -� S,�� s PhoneNumber: c��c, ��•7c.z �,�5� -"�5�� <br /> Mailing Address: n C�, � <�; � City: dtit ,h 7�p: ��3°�y <br /> DO NOT MAIL PAYMENT WITH THIS APPLICATION <br /> GENERAL INSTRUCTIONS <br /> 1. Applications for septic system permits may be mailed or submitted in person at the City <br /> Offices; however, permits will not be mailed out. The permit must be picked up in <br /> person at the City Offices and �•ork must not begin unless the permit card is on the job <br /> site. <br /> 2. Permits will be issued only to contractors holding a City of Orono Septic System <br /> Installers License. <br /> 3. All work must be done in accordance with the approved septic system design. Design <br /> reports are not considered approved unless accompanied by the "City of Orono Septic <br /> System Approval" cover sheet signed by the City Inspector. <br /> 4. The following inspections will be required for all septic systems: <br /> A. Pre-installation site inspection to include inspector, installer, and general contractor. <br /> B. Tank installation prior to covering. <br /> C. Drainfield trench installation prior to covering. For mounds, inspection is required <br /> after rough-up but prior to sand placement (sand will be jar tested for silt content), <br /> and again during pressure distribution piping installation in the rock bed. <br /> D. Final inspection to verify proper final cover depths and to verify that all pump station <br /> (where required) componenu are functional and comply with codes. <br /> 5. Individual holding MPCA Installer Certificate shall be present during inspections. A 24- <br /> hour notice is required for all inspections. <br />