Laserfiche WebLink
f .. � -� � �� <br /> � � <br /> CITY OF ORONO SEPTTC SYSTEM PERi�IIT APPLICATION <br /> Box 66 (2750 Kelley Parkway) <br /> Crystal Bay, I��1 5�323 <br /> � ����_= �� <br /> JOB STI'E ADDRESS: �Z�v�S `�' <br /> Occupancy Type: Residential �_ Commercial Other <br /> Permit Type: New or Replacement System, $100.00 _�._ <br /> Repair Existing System, $ 50.00 <br /> (Tanks or Drainfield) <br /> 0.�0 State surcnarge addeu iu a}��:�� f�e� <br /> *See fee schedule for non-residential permit fees <br /> , �J;c �1:,,,,,;,y,..� PhoneNumber: �7_� ��f/v <br /> Owner s Name: ��o�-►-Su �� :� ��;�� <br /> Nlailing Address: '� ' K�%�� <«' City:(,t.�.�z�+ �� <br /> Contractor's Name• � �-%,+.v.�� Rd S PhoneNumber: �t Z Y - �3�i3 <br /> .�- Cit n�C,.��-.:.s 7ap: S_s_; 7 <br /> Mailing Address: Z"�'z�o (cy T�` ��,, ,�. y: <br /> DO NO'T nZAII� PAYMENT WITH THIS APPLICATION <br /> GENER�L INSTRUCTIONS <br /> l. Applications for septic system permits may be mailed or submitted in person at the City <br /> Offices; however, permits will not be mailed out. The permit must be picked up in <br /> person at the City Offices and work must not begin unless the permit card is on the job <br /> site. <br /> 2. Permits will be issued only to contractors holding a City of Orono Septic System <br /> Installers License. <br /> J e i� .,u;,r�� miiSt }1P [�OR� ;n a�cordanc•e with the approved septic system desiQn. Desi�n <br /> reports are not considered approved unless accompanied by the "City af t)rono Septic <br /> System Approval" cover sheet si�ned by the City Inspector. <br /> 4, The followin� inspections will be required for all septic systems: <br /> A. Pre-installation site inspection to include inspector, installer, and general contractor. <br /> B. Tank installation prior to covering. <br /> C. Drainfield trench installation prior to covering. For mounds, inspection is required <br /> after rough-up but prior to sand placement (sand will be jar tested for silt content), <br /> and a�ain during pressure distribution piping installation in the rock bed. <br /> D. Final inspection to verify proper final cover depths and to verify that all pump station <br /> (where required) components are iunctional and comply with codes. <br /> 5, Individual holding MPCA Installer Certificate shall be present during inspections: A 24- <br /> hour notice is required for all inspections. <br />