My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
application/installation of utilities
Orono
>
Property Files
>
Street Address
>
R
>
Rainey Road
>
2601 Rainey Road - 04-117-23-44-0004
>
Land Use
>
application/installation of utilities
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:15:07 PM
Creation date
7/12/2018 1:43:20 PM
Metadata
Fields
Template:
x Address Old
House Number
2601
Street Name
Rainey
Street Type
Road
Address
2601 Rainey Rd
Document Type
Land Use
PIN
0411723440004
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A <br /> i� <br /> ; <br /> � . .. . :.�t`..� . .I <br /> ' . .__ . , . . . . ' � . .. '.A+.. <br /> PERTINENT REGULATIONS �`� <' ' `• <br /> Safety <br /> 1. All warning devices and barricades shall conform to the Federal Highway Administration's manua�on Uniform Traffic Control De- <br /> vices as amended by the State of Minnesota Manual Supplement. <br /> 2. All warning devices,barricades,flagmen and equipment shall be provided by parties or organizations performing the work. <br /> 3. Standard warning devices and barricades shall be placed as designated by the Hennepin County Department of Transportation. <br /> 4. Standard warning devices and barricades shall be kept clean and in good repair at all times. <br /> 5. Detour routing shall require 72 hours advance notice to the Hennepin County Utility Section. <br /> 6. Excavation shall be cribbed,sheeted and or fenced when necessary or as designed by the Hennepin County Utility Section. , .. <br /> _ , 7. Inctement weather shall be reason for delay of project start or suspension of project as determined by Hennepin County_ ___ _ <br /> OPERATIONS <br /> 1. Permit on Job— Permits or copies shall be kept on the site of the work while it is in progress in the custody of the individual in <br /> charge,and shall be exhibited upon requestmade by any county officiaL <br /> 2. Provisions and Specifications —These general provisions and specifiications shall be considered as forming an integral part of each <br /> a�d every permit issued for operations on eounty roads.The work authorized by this permit sMall be done at such time and in sucM <br /> manner as shall be consistent with the safety of the public and shall conform to all requirements and standards of the County of <br /> Hennepin as herein specified.If at any time it shall be found by the Hennepin County Department of Tra�sportation that the work <br /> is not being or has not been properly performed, the permittee, upon being notified by the superintende�t in writing, shall im- <br /> mediately take the necessary steps,at his own expense, to place the work in condition to conform to said requirements or starn <br /> dards. <br /> 3. Annulment — In the event of wilful failure or neglect by said permittee or his em�loyees to perform and comply with the pre- <br /> scribed conditions, restrictions and regulations,the Department of Transportation may revoke and annul this permit and order said <br /> permittee to remove any and all structures or property belonging to said permittee from the legal limits of the highway or county <br /> property. In the event the permittee leaves the highway in a condition needing repair or construction the Hennepin County Depart- <br /> ment of Transportation may repair such highway and the costs of such repair or construction shall be paid by the permittee. <br /> 4. Execution — The permittee shall use diligence in the executio� of the work.authorized under this permit in order'not to endanger <br /> or unnecessarily obstruct travel along the said highway. Operations shall be so conducted at all times as to permit safe and reason- <br /> ably free travel over the roads within the limits of the work herein prescribed.All safety measures for the free movement of traffic <br /> shall be provided by the permittee at his own cost <br /> 5. Conformity to laws— The installation shall be made in conformity with all applicable laws,regulations and codes covering said in- <br /> stallations.All installations shall be made in conformity with regulations of governmental agencies for the protection of the public. <br /> 6. Removal — If at any time the permitted structure or facility shall fail from any cause whatscever,the permittee shall have the same <br /> removed or repaired within 48 hours after receipt of written notice to do so,unless by reason of some extraordinary happening the <br /> superintendent may extend such time limit. <br /> ]. Existing Faeilities—Applicant must protect all existing utility installations. <br /> 8. Private Property —The work permit or permit for construction as issued does not in any way imply an easement on private prop- <br /> erty. <br /> 9. Damage to Roadway — If pavement or roadway is damaged,same shall be restored to its original or satisfactory condition,at the <br /> sole expense of the permittee. <br /> 10. Quality of Work — Finished surface, base and sub-base of road upon completion of work shall be at least equal to or better than <br /> specifications or original road. <br /> 11. Cutting Trees — The permission herein granted dces not confer upon the permittee the right to cut,remove, or destroy trees or <br /> shrubbery within the legal limits of the highway or relieve permittee from obtaining any consent otherwise required from the owner <br /> of the property adjacent thereto. <br /> 12. Boring or Jacking— Installation of pipe under roadways,shall be jacked or bored as designated by the Hennepin County Depart- <br /> ment of Transportation. <br /> 13. Liner or Casing Pipe—Shall be required for 4"or larger conduiL <br /> 14. Pressure Grouting—Shall be required as designated by Hennepin County Department of Transportation. <br /> 15. Drainage—All waterways and lines of drainage shall remain operative. <br /> 16. Pole Anchors—No pole anchors,anchors,braces or other construction on right of way except by permit authorization. <br /> 17. Driving Limitatioru—No driving onto highway from ditch or driving on shoulders or over curbs where damage will occur. <br /> 18. Lugs on Equipment—No lugs shall be used on equipment t�aversing road which will damage the road surface. <br /> 19. Clean-up —Street surface and roadside shall be kept clean,neat and presentable throughout construction as approved by Hennepin <br /> County Department of Transportation. <br /> 20. Dust Control—Shall be provided upon request of the Hennepin County Department of Transportation. <br /> 21. Trees and Vegetation — Bu�ning or disking operations and or the use of chemicals to control or kill trees,brush and other vegeta- <br /> tion is prohibited witbout prior approval from the superintendent. <br /> 22. Restoration — It shall be further understood that the permittee will be responsiWe for maintenance of any failures due to settle- <br /> ment,erosion, lack of vegetation growth, rutting,or other job related problems for a period of three(3)years after completion of <br /> project. <br /> 23. Manholes—All manholes,shut-off valve covers,etc.,shall be placed 1/2"lower than finished grade. <br />
The URL can be used to link to this page
Your browser does not support the video tag.