Laserfiche WebLink
, • <br /> [ ] pipes,ducts,wires,equipment and flues and chimneys through the interior air barrier are sealed <br /> [ ] a sealed continuous interior air barrier is installed on the warm side of the building envelope at ceilings,walls, <br /> and floor rim joist areas * <br /> [ ] air barrier behind tub and shower is sealed and protected <br /> [ ] recessed light fixtures are sealed <br /> Errvelope Insulation <br /> [ ] basement insulation R-5 minimum <br /> [ ] wind wash barrier on wall separating house and garage is sealed <br /> [ ] loose fill insulation is prevented from entering the eaves <br /> [ ] insulation on skylight shafts and walls exposed in attics is supported on the unconditioned side <br /> Attic Insulation <br /> [ ] attic access panel insulated to R-38 for ceiling panel and R-19 for wall panel <br /> [ ] attic card attached to framing near access opening <br /> [ ] notification of attic R-value and date of installation posted near building permit inspection card <br /> T'his is a summary only. Other requirements may apply. See the Minnesota Energy Code. Questions? Call the <br /> Department of Public Service Information Center at 651-296-5175 or 1-800-657-3710. <br />