Laserfiche WebLink
03/11/97 <br /> Work Items for the GILMORE RESIDENCE <br /> ELECTRICAL Fowser MECHANICAL Minnegasco Ditter Earl Day <br /> Repair existing circuits in basement Install 80% heating furnace $1,947.00 $2,020.00 <br /> '�dd grounded outlets in main floor Install Water Heater $549.00 $540.00 $550.00 <br /> fi�tait�l-outtet in ki�chen & bathrooms—- <br /> _—_ ___ __ _ _ <br /> Owner to pay difference, she prefers Ditter <br /> Install smoke detectors Mechanical Total $2,496.00 $2,560.00 <br /> Code electrical service $1,745.00 <br /> , Electrical Total $1,745.00 <br /> PLUMBING Earl Day <br /> Install pedestal lav. &faucet in main bath $620.00 <br /> Install cast iron bathtub &faucet $1,270.00 <br /> CARPENTRY Justus Lu Menards <br /> Install water closet $324.00 <br /> :eplace and instalt 32 windows $7,170.27 $7,424.12 <br /> Replace existing pressure tank $493.00 <br /> Carpentry Total $7,170.27 $7,424.12 <br /> Total Plumbing $2,707.00 <br /> Electrical Total $1,745.00 <br /> Total Plumbing $2,707.00 <br /> Mechanical Total $2,496.00 <br /> Contract Total 3/12/97 $6,948.00 �`��1��� <br /> �. c��o,� <br /> � -� c� j 8,oa <br /> �/� /�J��, � <br /> l <br />