Laserfiche WebLink
. ► <br /> ' .�.�.ti c.: .��. � 1.<�1 ,�f�'r <br /> _ ,. <br /> �, September 2, 198b <br /> Dear Crystal Bay Resident: <br /> The sanitary sewer project in the Crystal Bay area was <br /> completed, i.nspected and accepted on June 3.1, 1986. There are <br /> so�re .restoration items yet to be completed. <br /> I If you have not already done ao, you can connnect your <br /> ' residence or business to the sanitary sewer nain line. <br /> The deadline for connection to the sewez main line is 16 <br /> months from June 11, 1986 or October 11, 1987. <br /> ' A licensed contractor is required to make this type of <br /> �'�, connection in the City of Orono. <br /> I� The contractor must obtain a permit from the City prior to <br /> any work being done_ <br /> The permit fee is $30.50. A Seivic_ Availability Charge <br /> '� (SAC) of S475.00 must be paid befare or a•z •the time the permit is <br /> � issuec. Be advised that the City of Orono is only the collection <br /> agency for the SAC fee. The Metropolitan Waste Control <br /> � Commissi�n actually ieceives these monies. � <br /> � <br /> _ . i <br /> :_. � Some of you may have already paid the SAC fee in advance. • <br /> Y � For your information, your existing septic tank must be <br /> ° !, pumped and filled with approved fill when c�nnection to the sewer <br /> ������ ; main has been completed. <br /> X� - I <br /> - If you have ar.y questions, please feel free to call me at <br /> 973-7359. <br /> r; Sincerely, <br /> � / p �-�/ <br /> +µ' � <br /> � �Y'�"t /l. ' ,Li' LeY/!�G <br /> John R. Gerhardson, <br /> IPublic Works Coordinator • <br /> JRG/tln <br /> i <br /> �', <br /> � <br /> ;T+y�_: <br />