Laserfiche WebLink
. ► Fees to be Char ed YES NO <br /> Permit <br /> Plan Review j/' <br /> State Surcharge (/� <br /> Investigation Fee <br /> SAC—Number of SAC Units <br /> Other(specify) �� <br /> S uare Foota e $ er S uare Foota e <br /> Basement X = $ <br /> 1st Floor X = $ <br /> 2nd FIoO� X = $ <br /> Garage X = $ <br /> Estimated Construction Value: $ �, `7 J�i(%CSL� . <br /> Orono Inspections Required Work Requiring Separate Permits <br /> �Footing � Site Plumbing 0 Grading/Filling <br /> �Poured Wall Silt Fence/�rosion Control Mechanical 0 Fire <br /> Foundation Survey 0 +iardcover Removal Fireplace � Water Connection <br /> 0 Framing � Other(specify) 0 Masonry � Sewer Connection <br /> �Waterproofing/Drain tile �Mfg. � Lawn Irrigation <br /> � Foundation Waterproofing 0 Other(specify) � Landscaping <br /> Framing <br /> Insulation <br /> As-Built Survey <br /> Final <br /> Lathe Required State Permits <br /> � Other(specify) <br /> Well Electrical <br /> REMARKS (in-house): <br /> OFFICIAL REMARKS-TO BE NOTED ON PERMIT AND INITIALLED: <br /> � See Builder Acknowledgement Form <br /> 0 Prior to release of escrow money an as-built survey and hardcover calculations must be submitted and approved. <br /> Updated: October 2016 <br /> v:\forms�plan review checklist 10-2016.docx <br />