Laserfiche WebLink
Permit Application: Self-Checklist for Completeness <br /> Please note, the applicant must initial in the boxes below to acknowledge the minimum required <br /> information is included with the submittal. If not, the application will NOT be accepted. Call <br /> 952.249.4620 to schedule a meeting with staff if you have questions on application submittal <br /> requirements. <br /> :/ ,< <br /> Completed Application <br /> � Plan Review Fee Paid �� �� � ��� � <br /> Si ne Escr w A �,� ', c�����1� � <br /> g d o greement & Escrow Payment � �-f-�r� <br /> Building Plans (to scale) x2 ��, c i�� <br /> Certificate of Survey (to scale) showing the proposed project & <br /> "� meeting all requirements x2 "� (L--� C� vti�� <br /> � Hardcover Calculations (if applicable) y'�s�.E I��-��2��"� ����C� �' ► �`� <br /> , <br /> ' Sep ic (if ap�licab� A complianc� inspection m��r be required. <br /> ,� �,`� <br /> I am aware that Orono will not issue a building permit without a �� <br /> ;� <br /> copy of MCWD permits (or documentation from the MCWD stating <br /> � the proposed project does not trigger their permitting <br /> requirements). I will contact the MCWD at 952-471-0590 <br /> regardi�g this projec�. <br /> Signed ; �. �, � , I <br /> by; �"- � _.._ v, `" � v-�N `,J- �l�1 <br /> Address: � I �u' -' i (ll� �j� �,w (L <br /> Permit #: � �,� -� �-�?v y��2_ <br /> Packet Last Updated: January 2016 <br /> Page 2 <br />