My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-01460 - new house
Orono
>
Property Files
>
Street Address
>
P
>
Pinehurst Court
>
680 Pinehurst Court - 06-117-23-33-0015
>
Permits/Inspections
>
2017-01460 - new house
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:27:13 PM
Creation date
7/9/2018 10:14:49 AM
Metadata
Fields
Template:
x Address Old
House Number
680
Street Name
Pinehurst
Street Type
Court
Address
680 Pinehurst Ct
Document Type
Permits/Inspections
PIN
0611723330015
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Builder Acknowledgement Form <br /> Permit #2017-01460 / 680 Pinehurst Court <br /> . , <br /> } , , . , , <br /> Builder Representative Name: ,�1�'(i� � � �� , ( .--1�. <br /> ✓� <br /> Permit Conditions: Initials <br /> **NOTE CHANGE** Before scheduling an exterior insulation and/or drain tile inspection, a <br /> foundation as-built survey must be submitted and approved by the City or a Stop Work order � p J <br /> will be issued. ,`'��' <br /> Schedule a minimum of one hour for the framing inspection. . , ,�� i <br /> � V <br /> Erosion control mechanisms must be installed and inspected by the City prior to any land <br /> disturbing activities. The contractor must provide a minimum of a 24 hour notice prior to � n,J <br /> inspection. �/G <br /> Erosion control shall be installed and maintained throughout the entire project and must <br /> remain until vegetation has been established. ' 1�,,� <br /> A haul route shall be submitted to the City Engineer for approval and inspection prior to <br /> commencement of hauling from the site.The property owner shall be responsible for cleaning i <br /> and repair of roadways for any adverse impacts. '��`�`� <br /> No underground sewer within 20 feet of well. , <br /> �� � � <br /> Prior to the issuance of a Certificate of Occupancy an as-built survey and hardcover calculations ;�,`�,r � <br /> must be submitted and approved. �"1�` <br /> In the event of winter or other extended unfavorable weather conditions (which prevent the <br /> completion of the exterior improvements and/or as-built survey) a Temporary Certificate of ,} ; ,�? <br /> Occupancy(TCO) may be necessary. A TCO requires a $10,000 escrow. I � ` <br /> Advisory Comments <br /> Any changes to the exterior/landscaping improvements, i.e. patios, grading, sidewalks, retaining <br /> walls, etc. not currently shown on the approved survey and landscaping plan will require a � <br /> separate Zoning Permit application to be submitted and approved prior to the work Ajl �-L <br /> ;�. <br /> commencing. � ` <br /> Any retaining walls that are over 4-feet in height or tiered walls not separated by twice of the <br /> height of the lower wall require engineered plans and a building permit to be submitted and �`t��,`� <br /> approved prior to construction. '� `� <br /> w:\street files\pinehurst court\680\builder acknowledgement form 2017-01460.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.