My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
septic design-general approval only
Orono
>
Property Files
>
Street Address
>
P
>
Pinehurst Court
>
650 Pinehurst Court - 06-117-23-34-0006
>
Septic
>
septic design-general approval only
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:27:23 PM
Creation date
7/9/2018 9:13:07 AM
Metadata
Fields
Template:
x Address Old
House Number
650
Street Name
Pinehurst
Street Type
Court
Address
650 Pinehurst Ct
Document Type
Septic
PIN
0611723340006
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(��vt�Na/� ��I��'�U�� �� � ►�t/�:lC �� ,�'��`f s , <br /> _ - ,� ' � �' �� �,�,,, ,� ct i� <br /> �, � er�� a �-��ie � .9ey�� G C��'�rl <br /> �G � � ��' <br /> Joseph Olson D.B.A. <br /> Rusty Olson's--Soil and Percalation Testing <br /> Joseph J. Olson--MPCA License#810 <br /> l 1�t81 Riverview Rd. NE, Hanover, MN _55341 <br /> (763)498-8779 Fax(763) 498-$290 <br /> February 1.?O l 8 <br /> Nortan Homes <br /> 6i0 Pinehurst Court <br /> Orono, Hennepin County� <br /> This on-site Se�vage Treamient Systeni is designed for a Type 1, four-bedroom home in accordance with <br /> the Minnesota Pollution Control AgencS�Chapter 7080 and local ordinances. <br /> The periodically saturated soils were located at 12-20 inches(mottled soil). Due to the periodically <br /> saturated soils,a pressurized mound s�•stzcn �r�ith G inches of rock�vill i�eed to be installed to treat the septic <br /> efflucnt. The bottom ofthe treatment area must be located at least 3'above the saturated soils.This s��stem <br /> is designed with 6 inches of rock. <br /> The future site is dual rock beds using gate vatves for unlevel pressure distribution. <br /> The soils at a depth of 1?"have a percolation rate averaging 12 MP[. <br /> A?��0-eallon septic tank is desi�ned for this site.All tanks need to be insulated if there is less than t�4�o <br /> feet of caver over the top of the tanks.Clean outs must be installed on the end of the laterals for <br /> maintenance. <br /> Use 7/32-inch perforations on the laterals. <br /> A Darwin 1.i00-gallon pumping chamber��ill need to be installed to lift the efFluent to the treatment area. <br /> The po«�er supply and s�vitches must be located outside the manhole and pumping chamber in a <br /> weatherproof enclosure. A��arning device must be installed with light and sound de��ices;this is in case of <br /> a pump failure. A flo���measurement device must be installed. [ncluding but not limited to a water meter. <br /> event counter,running time clocks or eleetronicall��contro(led dosing. <br /> Keea all heavv equioment off of the aronosed treatment ttreas before,during and after construction <br /> The area around both sites must be fenced off b��the contractor before am construction beEins. <br /> With proper instatlation and maintenance,this system shauld have no problem in treating septic et�luent <br /> effectively.Nothing other than gra� water.(laundry. showcrs,etc.�Human water and toilet tissue should be <br /> disposed of into the septic tanks. Iron filters cannot go into the septic svstem.Garbage disposals are not <br /> recommended.Additives must not be used the��may cause harmful damase to your septic system. [t is <br /> recommended d�at you pump thc septic tanks every two years. v <br /> Sinc�rely, <br /> �� '6' Jose h J.Olson � <br /> p <br /> Ft�CEiVED <br /> �EB 0 8 2018 <br /> CITY OF ORONO <br />
The URL can be used to link to this page
Your browser does not support the video tag.